Local News

Cracked rail causes significant delays on Red Line

Reported by: Steve Cooper | Follow Steve on Twitter
Posted: 02/06/13 at 9:35 am    Updated: 02/06/13 at 12:48 pm
Tags: Boston   rail   Red Line   cracked rail   delays     

BOSTON (WHDH) -- The MBTA found a crack on a rail between Central and Harvard Stations on the Red Line Wednesday morning.

The crack was on the northbound track. Service was shut down and passengers were bused around the problem.

Commuters were frustrated as they sat underground for about a half an hour before they were able to get through the problem.

The issue was repaired by mid-morning, according to the MBTA. The hope is passengers will have a better commute Wednesday evening.

(Copyright (c) 2013 Sunbeam Television. All Rights Reserved. This material may not be published, broadcast, rewritten, or redistributed.)

Latest Local Videos